SATS :: Volume #5

#497: STAR installment! ( 3 / 3 )


LNMTL needs user funding to survive Read More

Studies the Black Science & Technology System document Chapter 497 star installment of tyrant! The time passes by day-by-day, quickly to April. 学霸的黑科技系统正文卷第497章star装置!时间一天天过去,很快到了四月份。 Also wants on quick some compared with the original plan, in nuclear industry construction group with five times, even is in the situation that ten times of manpower fill , the construction item of star Stellarator research institute, is completed finally officially. 比原定计划还要快上一些,在核工业建设集团用五倍,甚至是十倍的人力去填的情况下,star仿星器研究所的施工项目,终于正式竣工。 When Commander wears takes the scissors of cutting the ribbon, it hands over in the Lu Zhou hand time, lifts the right hand seriously, to him good military salute. 当戴团长拿着剪彩的剪刀,将它交到陆舟手中的时候,郑重地抬起右手,对他行了个军礼。 Although Lu Zhou is not a serviceman, was not clear that this military salute means anything, but through the look of Commander wears, he can very obvious feeling, that place the expectation in line of sight. 虽然陆舟不是军人,也不清楚这个军礼意味着什么,但通过戴团长的眼神,他能很明显的感受到,那份寄予在视线之中的期望。 But at the same time, was disassembled the packing ega Stellarator, with the footsteps of repatriation delegation, enters port from the harbor of Haizhou. 而与此同时,被拆卸装箱的ega仿星器,也随着归国代表团的脚步,从海州的港口入港。 500 million euros, converted rmb about to have 4 billion. 5亿欧元,换算成rmb将近有40亿了。 Although this money spends is not own, but looks that so many funds flowers go out, some Lu Zhou anxiety. 虽然这钱花的不是自己的,但看着这么多经费花出去,陆舟还是有些肉疼。 However he also knows, absolute above the price in value that this sum of money spends. 不过他也知道,这笔钱花的绝对物超所值。 although the ega installment closed down more than five years of time, but in these five years closing down period, the MPI learned plasma physics research institute has not actually put it to rust there, at least the regular maintenance and maintenance are many. ega装置虽然被关停五年多的时间,但在这五年的关停期内,马普学会等离子体物理研究所却没有放着它在那儿生锈,至少定期的保养以及维护是不少的。 Another, is counted the research and development expense, to build this equipment, the German paid at least 1 billion euros funds. 再一个,算上研发费用,为了打造这台设备,德国人花了至少10亿欧元的经费。 Words that wants to come, he is also picks up a bargain. 这么想来的话,他也算是捡了个便宜。 After all, the related technology of sg-1 wire, again value 1 billion euros that high sky-high price. 毕竟,sg-1导线的相关技术,再怎么也值不了10亿欧元那么高的天价。 Under the coordination of Su provincial government, the ega Stellarator equipment, transported to Jinling from the Haizhou harbor at the maximum speed, delivered to the Purple Mountain star Stellarator research institute. 在苏省政府的协调下,ega仿星器的设备,以最快的速度从海州港口运抵了金陵,送到了紫金山脚下的star仿星器研究所。 Stands in inserting the mountain massif laboratory, looks at that pile of value not poor equipment and components, Academician Pan on the face wrote all over excitedly. 站在嵌入山体的实验室内,看着那那堆价值不菲的设备以及零件,潘院士脸上写满了激动。 However at this time, but also in the excited head elderly man, sighed suddenly. 不过就在这时候,还在兴奋头上的老人家,忽然又叹了口气。 Pitifully was...... Academician Pan who bought shakes the head, sighed with emotion one, „, we, if also had that ability, from beginning to end made one to be good.” “可惜是买回来的……”潘院士摇了摇头,感慨了一句,“等什么时候,咱们要是也有那个能力,从头到尾造一台就好了。” Hears these words, Lu Zhou almost by own saliva not choking. 听到这句话,陆舟差点没被自己的口水给呛到。 Just now buys is keeping thinking about the copy. 才刚买到手就惦记着仿造了。 Is this quests for Sichuan after conquering Gansu? 这算是得陇望蜀吗? He is not an engineer, not good to appraise the project difficulty of Stellarator track from the project. But even if viewed from the exterior, coming out Tokomak and Stellarator who which project difficulty he can distinguish is bigger. 他不是工程师,不太好从工程上来评估仿星器轨道的工程难度。但哪怕是从外形上看,他都能分辨的出来托卡马克和仿星器哪个工程难度更大。 To be honest, even designs the Stellarator American, oneself cannot make this gadget, finally one side making throws to half of C Stellarator does not do, fiddled with Tokomak with the former Soviet Union. 说实话,就算是设计仿星器的美国人,自己也造不出来这玩意儿,最后把造到一半的c型仿星器扔一边不搞了,跟着前苏联捣鼓起了托卡马克。 Therefore, cannot make and has nothing to lose face. 所以,造不出来并没什么可丢脸的。 The technique industry has to study, not only in the academic circle, is also suitable in the industrial world. 术业有专攻不只是在学术界,在工业界同样适用。 Coughed lightly the sound, Lu Zhou said: Food eats one after another, this only started, we can walk every step to be good routinely. Moreover we do not need to achieve perfectly each place, only needed to achieve irreplaceable in the essential place to be enough.” 轻咳了声,陆舟说道:“饭得一口一口吃,这才刚刚起步,咱们能按部就班地走完每一步就不错了。而且我们也不需要把每一个地方都做到最完美,只需要在关键的地方做到无可替代就足够了。” Academician Pan shakes the head: That said that but where there are inferior to others, I always do not feel steadfastly.” 潘院士摇了摇头:“话是这么说,但有什么地方不如人家,我总觉得心里不踏实。” Regarding the words of Academician Pan, Lu Zhou silent a while. 对于潘院士的话,陆舟沉默了一会儿。 Because he does not know how should reply. 因为他也不知道该如何回答。 After all the lots are not a blueprint can solve. 毕竟很多东西不是一张图纸就能解决的。 Otherwise, that was not what issue. 否则的话,那也算不上什么问题了。 Stands in Lu Zhou another side, what is different from Academician Pan of being swayed by personal gains and losses, excited hold Xianfu, this little while has been ready to fight. 站在陆舟的另一边,和患得患失的潘院士不同的是,一脸兴奋的盛宪富,这会儿已经在摩拳擦掌了。 Now starts to assemble?” “现在开始组装吗?” Had one month of training that side Germany, now is one's turn him finally flexes the muscles. 在德国那边接受了一个多月的培训,现在总算是轮到他大展拳脚的时候了。 Looks at hold Xianfu, Lu Zhou nods. 看着盛宪富,陆舟点了点头。 Un, can start.” “嗯,可以开始了。” Moreover, the outfield coil does not need to install temporarily, when the time comes we will use newly.” “另外,外场线圈暂时不用装上去,到时候我们会用新的。” ...... …… According to original plan, after transporting to China, the ega installment is officially renamed the star installment. 按照原定的计划,在运抵华国之后,ega装置正式更名为star装置。 As the personnel and equipment have taken place, the research project about Stellarator project also was in the next stage. 随着人员和设备均已经就位,关于仿星器项目的研究计划也由此进入了下一个阶段。 So far, completed the puzzle of controllable nuclear fusion DEMO, Lu Zhou has grasped two. 到目前为止,完成可控核聚变示范堆的拼图,陆舟已经掌握了两块。 And as eye he-3 atom probe technology, as for another naturally then as torso star equipment. 其中一个是作为“眼睛”的he-3原子探针技术,至于另一个自然便是身为“躯干”的star装置本身。 In fact, as the prototype of spiral stone 7-x installment, in the star installment should have the thing that to have, so long as conducts the renewal to some modules, Lu Zhou has the confidence to complete one time is not inferior in spiral stone 7-x obtains the ignition of victory. 事实上,作为螺旋石7-x装置的原型,star装置上该有的东西都是有的,只要对其中部分组件进行更新换代,陆舟有信心能够完成一次不逊色于螺旋石7-x所取得战果的点火。 But must achieve this key, then related to the controllable nuclear fusion blueprint on third puzzle, as both legs ECR ion source. 而要做到这一点的关键,便涉及到了可控核聚变蓝图上的第三块拼图即,作为“双腿”的超导磁体。 In fact, this puzzle Lu Zhou has completed half. 事实上,这块拼图陆舟已经完成了一半。 Completes after the sg-1 wire high-pressure, designed carbon base superconducting material -based ECR ion source project to start. 从sg-1导线合成技术完成之后,设计“基于碳基超导材料的超导磁体”项目就已经上马了。 Such that just like also Lu Zhou expects, the sg-1 wire good heat conduction performance, enabling the project volume of liquid helium refrigeration part to obtain the enormous deflation. The data of response in blueprint is, compares the copper oxide coil, at least can save 20% project area. 也正如陆舟所预料的那样,sg-1导线良好的热传导性能,使得液氦制冷部件的工程体积可以得到极大的缩减。反应在图纸上的数据是,相比起铜氧化物线圈,至少能够节省20%的工程面积。 But what do 20% project area mean? 而20%的工程面积意味着什么? This means that he can let the star Stellarator restraint magnetic field strength, compared with its predecessor ega, rises one time to continue! 这意味着,他能让star仿星器的约束磁场强度,比起它的前身ega,翻上一倍不止! Another side, in the value surpasses 500 million rmb orders as well as under the dual stimulation of administrative order, the factory of Julius Baer is expanding the capacity of sg-1 wire unceasingly. 另一边,在价值超过五亿rmb的订单以及行政命令的双重刺激下,宝盛集团的工厂不断地扩大着sg-1导线的产能。 But production the wire, a release, was basically just delivered to the star Stellarator research institute, is improved the section diameter almost to have the calf thick or thin, vertical by that side engineer is putting some almost two people high beaming coils. 而生产出来的导线,基本上刚一出厂,便被送到了star仿星器研究所,由那边的工程师改良成截面直径差不多有小腿粗细、竖着放差不多有两人高的集束线圈。 In these coils, is equipped with permits the liquid helium through the drive pipe, for maintains internal sg-1 material under the superconduction critical temperature. 在这些线圈中,内置有允许液氦通过的导管,用于将内部的sg-1材料维持在超导临界温度之下。 In order to make the coil output the stable magnetic field in the circular telegram process, in the flank of each group of beaming wires, but also assembles a reliable insulator support. After all regarding this type of precise instrument, wire, even if rocks one millimeter, may cause the serious experiment accident. 为了使线圈在通电过程中输出稳定的磁场,在每一组集束导线的外侧,还装配有一圈牢固的绝缘体支架。毕竟对于这种精密的仪器而言,导线哪怕晃动个一毫米,都有可能导致严重的实验事故。 After all in the Stellarator interior, simulation, but the temperature of star...... 毕竟在仿星器的内部,模拟的可是恒星的温度…… For serveral days, Lu Zhou basically soaked in the Stellarator laboratory of star project research institute, arrived at the scene to direct this work. 这些天来,陆舟基本上都泡在star项目研究所的仿星器实验室里,亲临现场地指挥着这项工作。 Passed through fought bravely consecutive one month , the first week after Labor Day, the engineer of star team, completed the assembly of last group of coils finally. 经过了连续一个月的奋战,在劳动节后的第一个星期,star项目组的工程师,终于完成了最后一组线圈的组装。 Stands before having a new lease of life star Stellarator, Lu Zhou wiped half of perspiration. 站在重获新生的star仿星器前,陆舟擦了一半汗。 Although without turning the spanner is going forth to battle, but designs at the beginning of the entire ECR ion source then participates in project, arrives very much clearly today this step, actually to experience many difficulty. 虽然没有轮着扳手上阵,但从整个超导磁体设计之初便参与到项目中的他,很清楚走到今天这一步,其中究竟经历了多少的艰难。 However was good because of these work completes finally. 不过好在这些工作总算是完成了。 Remaining. 剩下的。 Then confirmed his guess! 便是验证他的猜测了! The corners of the mouth brought back a happy expression, Lu Zhou looked that to stood in his nearby hold Xianfu, the nod orders. 嘴角勾起了一丝笑意,陆舟看向了站在他旁边的盛宪富,点头下令道。 Inspection installs various unit mounting.” “检查装置各组件安装情况。” Without the issue, the preparation energizes!” “如果没有问题,就准备通电!”
To display comments and comment, click at the button