An outward appearance of goods, has been ableto tellmost people, function that ithas.
一件物品的外观,已经能够告诉大多数人,它所拥有的功能。Zhang Yutianlooks the cargoshape on Heavy Truckdelivering, silentsmiled.张羽天看着重卡上运载的货物形状,无声笑了。Originally is also Flood Wall, looking at the thicknessshouldbefourpilesin the same place, even if the lengthgrewcompared withtheirproductswere close toonetime, how can also?
原来也是防洪墙,看厚度应该是四块摞在一起,哪怕长度比他们的产品长了接近一倍,又能如何?Flood WallChinahastoomanyfactoriesto do, but how manyfactoriescanguarantee, the Flood Walllong-termimmersionin the water, canguarantee the metalmaterialdoesn't have the rustto be spoiled?防洪墙华夏有太多厂家可以做,可是又有几个厂家能保证,防洪墙长期浸泡在水中,能保证金属材料不发生锈腐?Tian Ye Heavy Industryis unwarrantable, thereforehas toconstruct the subterraneanservicechannel, enablingworkerto enter the interior, regularstain removalandreplacementwaterproofingblock glue.天野重工都不能保证,所以不得不建设地底维修通道,让工人们可以进入内部,定期除锈和更换防水胶条。Tian Ye Heavy Industrycannot achieve, Zhang Yutiannaturallythinks that Monster Heavy Industrycannot achieve.天野重工做不到,张羽天自然认为巨兽重工也做不到。Thinks ofhereto leave, Zhang Yutianshakes the head, whatthis timewins is really a sense of achievementdoes not have.
想到这里离,张羽天摇了摇头,这次赢的真是一点成就感都没有。Ye Qinggets outfromfollowingLagonda, disregards the Zhang Yutianvisiondirectly.叶青从后面的拉贡达下车,直接无视张羽天的目光。„SinceMr. Yealsocame, ourtestsstart.” The Mayor Qu Kangxinsimilardoubts, howthisseesdoes not seem like the thing of toohigh tech.
“既然叶先生也来了,那我们的测试就开始吧。”曲康心市长同样疑惑,这怎么看也不像是太高科技的东西。Firsttakes the test, isWu Ji Metal ConstructionLimited Company.
第一个接受测试,是乌吉金属建材有限公司。Theirproductsareraising uptypeFlood Wall, usuallyFlood Wallcloses proximity to the ground, the dayriverwater risetime, Flood Wallopensto resist the floodlike the front door.
他们的产品是竖起式防洪墙,平时防洪墙紧贴地面,天江水位上升时候,防洪墙像大门一样翻开抵挡水患。
The firststress test, the large-scalesealwater currentside of recess, Wu Ji Metal Constructionworker, raising uptypeFlood Wallwill fixwith the nutin the fluentnotch, andfirsteven/includingfixedthreeFlood Wall.
第一道压力测试,大型的密封水流槽边,乌吉金建的工人,用螺母将竖起式防洪墙固定在水流槽口,并且一连固定了三块防洪墙。Flood Wallfinishedfixedly, after the staff in hydraulicslaboratoryinspect, nods, hinting the testcanstart.防洪墙固定完毕,水力学实验室的工作人员检查后,点点头,示意测试可以开始。Recordsvideo camerato be opened, Engineer that is responsible formanagingto testinforms the pressure spacewith the intercom: „Pressureraisestothreemegapascal, turbo-chargedfinishedpleasereport”
记录摄像机被打开,负责主持测试的工程师用对讲机通知加压室:“压力上调至三兆帕,增压完毕请汇报”
The water depthincreasestenmetersevery time, the pressurewill increasemakes0.1megapascal, the dayriverwater levelis certainly impossibleto rise300meters.
水深每增加十米,压力就会增加约零点一兆帕,天江水位当然不可能上升三百米。
When according to the past yearswater levelrecord, Liangjiangsectiondayriverwater level, 1957is highest, at that time the water levelrosetenmeters.
根据历年水位记载,两江段的天江水位,1957年时最高,当时水位上升了十米。Begonia Islandhavecertainaltitude, thereforeFlood Wallsevenmetershigh, have been ablenot to fearanyflood.海棠岛自身有一定高度,所以防洪墙有七米高,就已经可以不惧任何水患。However the dayriver waterclass/flowis billowing, particularly the upstreamopening the sluice gatesflood dischargetime, the river waterimpulsedoes not allowslightlyto peep, the Begonia Islandimportancecannotdescribe, the testnaturallymustwithharshestmarksis doing.
但是天江水流滚滚,尤其是上游开闸泄洪时候,江水冲击力不容小窥,海棠岛的重要性不需描述,测试自然要用最苛刻的标着来做。Threemegapascalbarometric pressuresloadquickly, after Engineerknows the situation, saidwith the intercom: „No. 01Flood Wall, the teststarts.”
三兆帕的气压很快加载完毕,工程师得知情况后,用对讲机说道:“01号防洪墙,测试开始。”Withhisvoice, sealsin the fluenttrough, immediatelyresounds the water spraysound of galloping.
随着他的话音,密封水流槽内,立刻响起奔腾的水浪声音。Turbulentwater currentfromfluenttroughturbulent current, buttime, Wu Ji Metal ConstructionFlood Wall, „creakcreak”, under the lifting of hydraulic pressurestay rod, closestoward the fluenttroughslowly.
汹涌的水流从水流槽内激流而出时候,乌吉金建的防洪墙,也“嘎吱嘎吱”,在液压撑杆的举升下,缓缓朝着水流槽闭合。Underthreemegapascalpressurespromote, onFlood Wall that the fluenthitis raisingslowly, flew down straightlike the waterfall, hitson the rock, the sprayscattered, in the entireexperimentroom the mistfilled the air.
在三兆帕的压力推动下,水流撞击在缓缓升起的防洪墙上,就像瀑布飞流直下,打在了岩石上,浪花四溅,整个实验室内水雾弥漫。Bang, threeFlood Wall, closelyclosedin the fluentnotch.
轰地一声,三面防洪墙,紧紧地闭合在了水流槽口。Wu Ji Metal ConstructionBoss Wangis sipping the liptightly, standsoutside the safety linenervous. Threemegapascalpressures, heself-examined that installs the metalback plate that supportednot to have the issue, butthismiddlepacking, shuts the seal of healwith the bottom......乌吉金建的王老板紧抿着嘴唇,神情紧张地站在安全线外。三兆帕压力,他自问加装了支撑住的金属挡板没有问题,可这中间的密封条,和底部闭合口的密封……
The compressiontestmustcontinue for fiveminutes, Wu Ji Metal ConstructionBoss Wanglooks at a watch, is planningto time.
加压测试要持续五分钟,乌吉金建的王老板看一眼手表,正打算进行计时。Whoknowsto closeinthreeFlood Wall of fluenttrough, second and thirdpacking, suddenly“pū”collapseopen/start.
谁知闭合在水流槽的三道防洪墙,其中第二与第三道的密封条,突然“噗”一声崩开。
The pressure of urban water supplypipe networkonly haszeropointthreemegapascal, the water current of tentimes of impulse, simplysuch as a continuouswaterarrow.
城市供水管网的压力只有零点三兆帕,十倍冲击力的水流,简直如一柄连绵不绝的水箭。
The waterarrowhitson the rearporousman-madeflagstone, was absorbedto infiltraterapidly.
水箭打在后方的多孔人造石板上,被迅速被吸收渗透。„Packinghas not completed, thiscanimprove. hē hē”Wu Ji Metal ConstructionBoss Wangsmilesis very ashamed.
“密封条没做好,这个可以改进。呵呵”乌吉金建的王老板笑的很惭愧。Whothinks that the disgracedsecondleakageappeared, infiltrates**situated in the bottom, the arrowarrowwater currenthitdirectlyon the hydraulic pressurestay rod, the face of Boss Wangwas green.
谁想丢人的第二道渗漏出现了,渗**位于底部,箭矢般水流直接打在了液压撑杆上,王老板的脸都绿了。Thisplaceseeps, means the hydraulic pressurestay rod and hydraulic pumpwater penetration. The Boss Wangexpressionhas toldeveryonevery muchobviously, theirCompanythesetwomechanical parts, has not designed the waterproofstructure.
这个地方渗漏,意味着液压撑杆和液压泵进水。王老板的表情已经很明显告诉大家,他们公司并没有把这两个机械部件,设计成防水结构。„No. 01Flood Walltestfailure!”Engineerannounced the resultunemotionally.
“01号防洪墙测试失败!”工程师面无表情地宣布了结果。
The firstcheckpointis defeated, behind the naturedid not needto test.
第一道关卡失败,自然后面也不用测试了。Wu Ji Metal ConstructionBoss Wanghas no alternativeto argue: „OurCompanyforecast that a megapascalpressureis enough, the this timetestwas too strict, enhancedthreetimes of Standarddirectly.”乌吉金建的王老板无可奈何地辩解道:“我们公司预测一兆帕的压力已经足够,这次测试太严格了,直接提高了三倍标准。”„Begonia Islandis too importanttoLiangjiang, wenaturallymusttestwithstrictestStandard.”Engineerpatted the shoulder of Boss Wang: „Is unimportant, the packingsolves is not difficult.”
“海棠岛对两江太重要,我们自然要用最严格的标准来测试。”工程师拍了拍王老板的肩膀:“不要紧,密封条解决起来并不困难。”
After 20minute, the Conch Family Industriesproductwas installed the test panel.二十分钟后,海螺门业的产品被装上了测试台。Theirproductsare bolder, is the roll-up doorsamecurling and shrinkingtype, needsto installmanyto supportartificially.
他们的产品更大胆,是卷帘门一样的卷缩式,需要人工安装多根支撑住。
The firststress testpassesreluctantly, theirseal designsare very reasonable, butpouredin the secondanti-water sprayexamined.
第一道压力测试勉强通过,他们的密封设计挺合理,不过倒在了第二道抗水浪验上。
The watersurgeswave after wavecome, when the wavelevelincreases to5levels of rough seas, a wave height2.5meterstime, the Conch Family Industriesproduct, was struck againstby the sprayhad the slightdistortion.
一波接着一波的水浪涌来,当浪级增加到五级大浪,浪波高2点5米时候,海螺门业的产品,被浪花拍击地产生了轻微变形。„Is unqualified!”Engineershakes the head.
“不合格!”工程师摇摇头。Finallywas one's turnTian Ye Heavy Industry, Zhang Yutianthought that competedwiththesetwoenterprises, insultstheirproductscompletely.
终于轮到了天野重工,张羽天觉得和这两家企业同台竞技,完全是侮辱他们的产品。Theirproductsin the stereotypia, have done the metal fatigueexperiment, andis the dynamichigh and lowweekwearinessexperiment.
他们的产品早在定型的时候,就做过金属疲劳实验,并且是动态的高低周疲劳试验。
The strength of test instrument, maycompared with the strength of watermostly. Therefore the this timetest, Zhang Yutianhas no worry.
测试仪器的力量,可比水的力量大多了。所以这次测试,张羽天没有任何担心。Whentheirproductswere installedon the test panel, Ye QingalsomakestwoMonstrous Laboreruntie the cable on Heavy Truck, in the forkliftwithlaboratory, transportsfourleaves of Flood Wall.
当他们的产品被安装上测试台,叶青也让两名巨力苦工去解开重卡上的缆绳,用实验室里的叉车,将四扇防洪墙搬运下来。Zhang Yutiantransferred the visionquietly, the Mayor Qu Kangxinsimilarinstantnon-instantwatchedtheseFlood Wall.张羽天悄悄把目光转了过来,曲康心市长同样一霎不霎地看住了那些防洪墙。Thatisoneleafis 12 meters, widththreemeters, all over the body the shieldcontour of streamline.
那是一扇长12米,宽三米,通体流线的盾牌外形。Initsbottom, twoarcsformed a sharpsharp corner/horn, transportsin the process, the shieldshapeFlood Wallsharp corner/horn, did not delimit the canvascarefully, „cī la”, canvasby a notchimmensetearingmouth.
在它的底部,两条弧线汇成了一条锋利的尖角,搬运过程中,盾牌形防洪墙的尖角,不小心划到了帆布,“呲啦”一声,帆布被豁一条巨大的撕裂口。„Are youFlood Wall?”Zhang Yutianthoroughwas muddled: „12metershigh, how a basedoes not have, youplanned that and other dayriverwater levelsraise the time, sewsthissheet irononagate stone beachdirectly?”
“你这是防洪墙?”张羽天彻底糊涂了:“十二米高,怎么连个基座都没有,难道你们打算等天江水位抬高时候,就直接把这块铁板钉在玛瑙石滩上?”„Youcanunderstand.” The Ye Qingboothlets go.
“你可以这么理解。”叶青摊摊手。„Was insane, youwere certainly insane.”Zhang Yutianthought that Monster Heavy Industryiscomescompletelyfunny, thiswhereisFlood Wall, clearlyistogether the ovalshield, the contourmakescannot be of useagainfinely.
“疯了,你一定是疯了。”张羽天觉得巨兽重工完全是来搞笑的,这哪里是防洪墙,分明是一块椭圆盾牌,外形造的再精美又能顶个屁用。Itlet alonelittleautomationmechanism, a foundationdoes not haveeven.
它别说一点点的自动化机械结构,就算连个底座都没有。
The solidironshield, takes a broad view atChinatogether, 100,000have not had90,000Factory to do.
一块实心铁盾,放眼华夏,没有十万也有九万个工厂能做出来。Thisdoes not comefunny, iswhatmakes?
这不是来搞笑,是来做什么?
To display comments and comment, click at the button
Comments for Chapter #247: Monster Heavy Industry work