MF :: Volume #8

#726: Treasure


LNMTL needs user funding to survive Read More

Will finish early, Ye Qing looked at a time, later made the following person be scheduled one Occupies naturally Box. 早会结束,叶青看了眼时间,随后让下面人预定了一间【天然居】包厢 At noon the time, Yun Shi and Zhang Zhitong will return to Zhongyun together. 中午时候,云诗章之潼会一起返回中云 The present is 9 : 00 am, Ye Qing is abundant while the time, first returned to Dragon Creek Beach Factory. 现在是上午 9 点,叶青趁着时间充裕,先回了一趟龙溪滩工厂 These days Ye Qing is in the majority in the Company time, that side Factory has not stared. 这段时间叶青公司时间居多,工厂那边没怎么盯过。 Is good does not need any inspector general because of monster(s) worker, Ye Qing confessed duty that they would first completing. 好在怪兽工人们无需任何监督,叶青交代下来的任务,他们总会第一时间完成。 Arrives at Factory, except, even if looks are innumerable, should still feel the exclamation huge workshop. Huge stream of vehicles in the method of goods transfer center, is showing this piece of Factory vigor. 来到工厂,除了一座座即使看过无数次,也会觉得惊叹的庞大厂房。还有货物中转中心内的庞大车流,在彰显着这片工厂的活力。 Heavy Truck across country, like one only the ant that transports the cargo toward the ant's nest, forms the continuous motorcade, the time transports the raw material for industry toward Factory. 来自全国各地的重卡,就像一只只往蚁巢搬运货物的蚂蚁,组成连绵不绝车队,时刻往工厂内输送工业原料。 Plasma Battery suspends production, the production of Swift Thunder automobile has not stopped. 电浆电池停产,疾雷汽车的生产没停。 Now across the country desperately short of Swift Thunder automobile, when next batch of Metal Dysprosium receipt, factory side only with producing Plasma Battery, thus greatly reduces the standby period. 现在全国各地都急缺疾雷汽车,等到下一批金属镝到货,工厂这边只用生产出电浆电池,从而大大减少等待时间。 Meanwhile, first batch of 100 Energy Service Center will also soon be completed. Really is not when the time comes good, Ye Qing sends to support the facade these mere show Swift Thunder automobiles to inside 4 S shop. 同时,首批一百座能源服务中心也即将竣工。到时候实在不行,叶青就把这些空架子疾雷汽车发过去给里面的4S店撑门面。 Arrived at Factory, Ye Qing first inspects biological unmanned machine to produce center. 来到工厂,叶青先视察了仿生无人机生产中心 Compared with other product, the workshop occupying land area of unmanned machine wants on small many, the workshop only has more than 2000 square meters. The 3D printer that in six Tool Mall purchases, with two Full-motion Assembly Platform, is here most expensive device. 比起别的产品,无人机的厂房占地要小上许多,厂房只有两千多平方米。六台道具商城内购买的3D打印机,和两台全动组装平台,就是这里最昂贵的设备 No biological unmanned machine difficulty, in the biological flight mechanism, these ultralight machine parts, direct processing in the precise processing workshop completes, delivers to here to assemble again. Therefore so long as here has to make the unmanned machine outer covering, is enough with assembly device. 无仿生无人机难点,在仿生飞行机械结构上,这些超轻机械零件,在精密加工车间内直接加工完成,再送到这里组装。所以这里只要有造无人机外壳,和组装的设备就已经足够。 Currently unmanned machine produces center, is producing the unmanned machine order that General Assembly Department distributes. 目前无人机生产中心,正在生产总装部派发下来的无人机订单。 The order is divided into three contours, these three types are in China the common eagle. factory side only produces necessary military version Plasma Battery, the outer covering, with biological flight power system. 订单分为三种外形,这三种都是华夏境内常见的老鹰。工厂这边只生产出配套军用版电浆电池,外壳,与仿生飞行动力系统 Important electronic reconnaissance device, with the communication module, is responsible for by General Assembly that side. 重要的电子侦察设备,与通讯模块,由总装那边负责。 General Assembly Department order altogether 3000, could not take 35 days to produce is completed. Idle device, happen to be used to produce selfie Divine Tool. 总装部订单一共三千架,要不了三五天就能生产完成。闲置的设备,正好可以用来生产“自拍神器”。 According to this sample, first produces 100 experimental models to come out.” “按照这个样本,先生产一百架试验机型出来。” Ye Qing mini aircraft of small fire dragon appearance, hands over in the Master Craftsman hand, the racket his shoulder, encourages to say while convenient: Military version price is not high false, may produce several thousand over ten thousand at most, must to the end. If Civil Version develops, produces several hundred thousand estimates not to have the issue.” 叶青将一只小火龙样子的迷你飞行器,交到精巧大师手中,顺便拍拍他肩膀,鼓励道:“军用版价钱高不假,可顶多生产个几千上万架,就要到头。民用版如果开发出来,生产几十万架估计没问题。” „Does that outer covering also use the Polyether Ether-Ketone Compound material?” Master Craftsman spreads out the hand to catch the small fire dragon sample, „the Polyether Ether-Ketone Compound material price over a thousand, might as well together with other.” “那外壳还用聚醚醚酮复合材料吗?”精巧大师摊开手接住小火龙样品,“一块聚醚醚酮复合材料价格上千呢,不如用其它的。” With the aerosil, three D printing steps changes into the injection molding, such outer covering cost several dollars.” Ye Qing revealed the capitalist to have the smiling face that. “用硅胶,三D打印步骤换成注模,这样外壳成本才几块钱。”叶青露出了资本家才有的笑容。 hey hey Master Craftsman greets with a smile. 嘿嘿精巧大师陪着笑。 Inspects unmanned machine to produce center, Ye Qing arrives at the subterranean production base. 视察完无人机生产中心,叶青又来到地底生产基地。 At present the Factory expansion enters the slowdown period, has large-scale industry device to forge the processing ability the production base, enters the leisure period relatively. 目前工厂扩展进入放缓期,具有大型工业设备锻造加工能力的生产基地,也相对进入闲暇期。 Is good because of without idle several days, they were transferred by the Ye Qing full load, produce construct Nigeria livelihood of the people device, with mining area large-scale machinery device. 好在没闲几天,它们又被叶青满负载调动起来,来生产援建尼加亚的民生设备,和矿区大型机械设备 In these construction projects, day generated output 20 million kilowatt-hour of power plant is most important. The words that the local area needs to use electricity, they cannot use up to the electricity generation odd change, this power plant core mission is to prepare for the mining area electricity. 那些援建项目中,日发电功率两千万千瓦时的电站是重中之重。当地需要用电的话,给个发电零头他们都用不完,这座电站核心目地是为矿区用电做准备。 The 20 million kilowatt-hour, is equivalent to the daily total power consumption of China coastal developed county. 两千万千瓦时,相当于华夏沿海一座发达县城的每日总耗电量。 The local area does not have the terrain dropping variance big rivers, does not have the sufficient wind energy, Ye Qing naturally can only consider the thermoelectric power station. 当地既没有地形落差较大的河流,也没有充足风能,叶青自然只能考虑火电站。 With the coal the water heating the steam, the steam drives the steam turbine revolving electricity generation again. 用煤炭将水加热成蒸汽,蒸汽再带动蒸汽轮机旋转发电。 Sounds very backward, without nuclear power on big. However Monster Industrial has not constructed the nuclear power plant technology at present, even if there are, is not worthwhile in Nigeria that damned place constructs nuclear power plant, although the local mining area has the rich uranium resources. 听起来很落后,没有核电高大上。不过巨兽工业目前还没有建设核电站的技术,就算有,也犯不着在尼加亚那个鬼地方建设核电站,虽然当地矿区有着丰富的铀资源。 The thermal power sounded like last century thing, but the electric power supply of entire world, the thermal power held the largest scale as before. 火电听起来像上个世纪的东西,但是全世界的电力供应,火电依旧占有最大比例。 China three years ago, the thermal power electricity generation proportion occupies 75% as before, in recent years the massive development of water and electricity and nuclear power, making this data fall 60%, but the thermal power is China is still biggest at present the stablest electric power supply channel. 华夏在三年前,火电发电比例依旧占到75%,近几年水电和核电的大规模发展,让这个数据降到了60%,但火电依旧是华夏目前最大最稳定的电力供应渠道。 Meanwhile, with the development of industrial level, core device of thermoelectric power station Thermal Power Unit, Also more and more terrifying. 同时,随着工业水平的发展,火电站的核心设备火电机组】,也越来越恐怖 From the early boiler steam engine, to the steam turbine, to is subcritical and supercritical, Ultra-supercritical Unit. Development of Thermal Power Unit, became only then industrial power, has the treasure of country the qualifications handle. 从早期锅炉蒸汽机,到蒸汽轮机,再到亚临界、超临界,超超临界机组火电机组的发展,也成了只有工业强国,才有资格玩转的国之重器。 In this, is China to play in Thermal Power Unit best. 这里面,又属华夏火电机组里玩的最好。 Currently China plans the newly-built thermoelectric power station, uniform is supercritical, with Ultra-supercritical Unit. 目前华夏计划新建的火电站,清一色都是超临界,和超超临界机组 What concept is the supercritical? 超临界机组是什么概念呢? After the steam quality surpasses the water critical state the parameter, the water is not only the steam, the steam is not only the water. 当蒸汽参数超过水临界状态的参数后,水既是蒸汽,蒸汽既是水。 They became a special condition, the water has the steam same good fluidity, is far higher than the density of gas, when flows through the steam-turbine unit, brings the far ultra ordinary steam the power. 它们成了一种特殊的状态,水具有蒸汽一样的良好流动性,又远高于气体的密度,流经汽轮机机组时,带来远超普通蒸汽的动力。 Will seethe with excitement the water heating to Baidu|numerous, but supercritical, then needs the temperature of water to be 550 degrees. Ultra supercritical, is 600 degrees. 水加热到一百度会沸腾,而超临界机组,则需要水的温度达到550度。超超临界,达到600度。 The temperature of water, with lighting the matches flame temperature is the same. 水的温度,已经和点燃了的火柴火焰温度一样。 Not only mysterious, and terrifying! 既神奇,又恐怖 Ye Qing stands in Underground Base the time, at present already eight sets, completely huge broad device that becomes by high-strength thermostable alloy material forging. 叶青站在地底基地内时候,眼前已经有八套,完全由高强度耐高温合金材料锻造而成的庞大恢弘设备 At present, each set of device volume has Boeing 737 fuselage lengths, but also probably extend compared with it, but also is high. The silver-white diameter surpasses three meters thermostable alloy pipeline, connects one on the left and other on the right in device both sides, the middle also has just like the automobile transmission same numerous fine gear, each piece of gear, can crash a sedan with ease. 眼前,每一套设备的体积都有一架波音737的机身长度,但要比它还要宽,还要高。银白色直径超过三米的耐高温合金管道,一左一右连接在设备的两端,中间还有宛若汽车变速箱一样的众多精密齿轮,每片齿轮,都能轻松压垮一辆轿车。 These are supercritical Thermal Power Unit. 这些是超临界火电机组 Each set of power 2 million kilowatts, one set can lighten the street light 20 four hours of Nigeria national. 每套功率200万千瓦,一套就能把尼加亚全国的路灯二十四小时点亮。 Ye Qing produces 12 sets, two sets act as the standby unit. 叶青计划生产十二套,其中两套充当备用机组。 Not is only the unit, it also needs one set of huge and special boiler, makes the temperature to achieve 550 degrees steam, but also needs one set of high pure water cycle system, with power transformation system. 不仅仅是机组,它还需要一套庞大而特殊的锅炉,来制造温度达到550度的水蒸气,还需要一套高洁净的水循环系统,和变电系统 This is the great nation treasure! 这是大国重器! Looks at present these device, Ye Qing ecstasy. 看着眼前这些设备,叶青心醉神迷。 Only what is a pity is these device is extremely at present huge, even ten Ilyushin IL-76, are unable to transport even if one set of supercritical, can only depend upon ten thousand tons huge ship marine transportation. 唯一可惜的是眼前这些设备太过庞大无比,即使是十架伊尔—76,也无法运输哪怕一套超临界机组,只能依靠万吨巨轮海运。 At present, [The Colossus] through Strait of Malacca, has entered Indian Ocean. 目前,巨神号已经通过马六甲海峡,进入印度洋 Ye Qing calculates unceasingly and other [The Colossus] came back to transport again, so long as these device produce, second six 10 thousand-ton bulk cargo ship, will deliver these device to go to Nigeria. 叶青不断算等巨神号回来再运输,只要这些设备生产完毕,第二艘六万吨级散装货轮,就会运载这些设备前往尼加亚 Naturally, cargo ship rents. 当然,货轮是租来的。
To display comments and comment, click at the button